1.P&ID vs PFD

Interpreting technical diagrams is often a challenge for young engineers. Identifying and understanding the different symbols that appear on a diagram as well as the connection between the different elements may seem trivial at first but sometimes requires additional knowledge.

This article is a brief introduction to the question of how to read a P&ID and what information is contained on a P&ID. This article will review general concepts and basic rules to offer in the last section a final list of the different identifications and symbologies necessary to make a good interpretation of a diagram.

The P&ID starts from the PFD and includes the control loops. If we compare both kind of documents, PFD and P&ID, the P&ID Diagram has more details about the plant topology and displays equipment (including spare units), pipe lines (with details about scheduling and isolation), instrumentation and valves and signal related.

So, the P&ID Diagram let you visualize in just one time the process flow and all the related control functions and monitoring functions.



Other related articles :

2.What information is contained on a P&ID?

The information usually displayed in P&ID diagrams is:


  • Plant equipment, normally we will find all types of process pumps, compressors and any other type of rotating element, such as centrifuges or air coolers. It is possible that in the tanks or vessels we can find the different design levels (maximum, normal and minimum).
  • It is a good practice to represent the relative size, shape, and location of the actual equipment in the plant. Pitting, nozzles and access routes should normally be defined in this type of diagram.

    Pitting, nozzles and access routes
    Pitting, nozzles and access routes
  • Regarding the instrumentation, we will find in this type of diagram all the information related to the connection of the instrument with the control system, either through a current loop connection or through a data bus.
  • In the P&ID diagrams we will find information on all the process pipes, control valves and ON / OFF valves, any type of derivatives of the process flow, relief valves, safety valves, drains, and any other type of element or device in line such as, for example, check valves, filters or reductions / extensions.

    Process pipes, control valves and ON / OFF valves
    Process pipes, control valves and ON / OFF valves
  • Typically you will also find the design and set pressure of all the relief and safety valves, as well as the same information for the rupture discs, pressure and temperature regulators.In the case of lines with a layout, we will normally find the type of layout if it is steam or electric, and if it also has an automatic control system, it will appear in the diagram.
  • When it is necessary to indicate the existence of sloping lines, the slope will normally be displayed. A common case can be the arrangement of the pulse lines of an orifice plate with the corresponding pressure instrument.
  • In the case of motors, its voltage and power can be displayed or displayed.Usually the motors have a typical and standard connection diagram for the entire plant.
  • The logic associated with starting and stopping the motor is usually included in P&ID diagrams.
  • Elements related to control and instrumentation:
    • All instruments are represented by standardized symbols that indicate the location of the equipment, whether it is in the plant or in the technical room, and the type of connection of the instrument with the associated control system.
    • Depending on the type of connection and the equipment where it is connected, a different symbol will be used.The P&ID will use symbols and circles to represent each instrument and how they are inter-connected in the process.
    • For example, the same symbol is not used for an instrument that is connected to a distributed control system (DCS) or for an instrument connected to a Safety Instrumented System.In addition, we will also find represented the signal transmission method and the actions of the control valve in case of air / electrical failure, that is, failure to open (FO), failure to close (FC) or last lock failure. position (FL)

More information can be found in our article P&ID Symbol Diagram Basics - Part 1 - Purpose, Owner & Contents.

3.P&ID Diagram Design

General Rules


The design of a P&ID diagram generally follows from left to right in the drawing.

Notes are usually added to the right side of a P&ID above the title block and are used to:

  • Describe elements of the P&ID.
  • Provide guidance in understanding the P&ID information.
  • Make reference to other documents

Any piece of equipment or instrument should be shown only once in a single P&ID diagram. If it is necessary to show it in more than 1 P&ID diagram, it is necessary to indicate or represent the equipment or instrument through dotted lines or clouds.

3.1 What is included in a P&ID Drawing?

  • Shows relative location of process equipment, sensors, actuators in a process.
  • Conceptual outline of a chemical plant.
  • Provide common language for discussing a plant.
  • Show control connections between sensors and actuators.

3.2 What is not included in a P&ID Drawing?

  • Not an architectural diagram of a process. Positions in a P&ID do not correspond to a 3D position, but more a connectivity.
  • Not to scale.
  • Not a diagram of the reaction kinetics.
  • Not a control diagram (block diagram), influence graph, incidence graph, Bayesian network, or correlation network.

Reactors, tanks, vessels and equipment are not drawn to scale.

What do we mean? The elements present in the diagram are not to scale, which implies that it is possible to find that the location of some elements, for example drains, is not in their exact position.

3.3 Direction of Flow

In general, the main direction of flow proceeds from left to right and from top to bottom. Inlet and outlet arrows are used for indicating the inlet and outlet of flows into or out of the diagram. Arrows are incorporated in the line for indicating the direction of the flows within the flow diagram. If necessary for proper understanding, arrows may be used at the inlets to equipment and machinery (except for pumps) and upstream of pipe branches.

Process lines entering and leaving the diagram from/to other drawings in the Unit shall be terminated at the left-hand or right-hand side of the drawing.

Process lines entering and leaving the diagram
Process lines entering and leaving the diagram

3.4 Crossing Lines

To obtain a clear representation, different line widths shall be used. Main flow lines or main piping shall be highlighted.

To indicate that two lines are connected we will use the diagram on the left, to indicate that there is no connection between the lines we will use the diagram on the right.

Connected Lines
Connected Lines
Non-Connected Lines
Non-Connected Lines

As shown in the figure below, the pipe and signal lines, also known as the major and minor lines, should be broken according to the hierarchy in the order of major- minor and primary-secondary lines, when they cross.

Crossing lines - Walker, 2009
Crossing lines - Walker, 2009

3.5 Instrument Locations

Instrumentation symbols reflect process instruments, for example, transmitters, gauges, valves, analyzers, or controllers.

Instrument functions and locations - Example of a typical implementation
Instrument functions and locations - Example of a typical implementation

These symbols and their corresponding labels identify the instrument's functions and their locations. To learn more about the different instrument naming systems you can read our article:

P&ID Symbol Diagram Basics - Part 3 - Functional Identification and Naming Conventions.

The following figure from the ISA standard document lists common instrumentation symbols.

Instrument functions and locations - Common instrumentation symbols
Instrument functions and locations - Common instrumentation symbols

As shown in the previous figure, we can find 4 types of graphical shapes, such as circles, squares, hexagons, and diamonds, possess specific denotation.

  • A circle indicates a device is located in the field area of a plant.

    P&ID Diagram - Instrument Representation
    P&ID Diagram - Instrument Representation

  • A circle with an external square represents devices or functions which belong to a shared display and control system, for example a DCS system.

    P&ID Diagram - DCS Representation
    P&ID Diagram - DCS Representation

  • A hexagon represents a computer function.
  • A diamond with an external square defines functions within a programmable logic controller, for example an alarm configured in a SIS (Safety Instrumented System).

Regarding the lines inside the symbols:

  • No horizontal line - located somewhere in the field, probably close to the general area shown on the P&ID.
  • Single horizontal line - One line inside means the device is located in the central control room or some computer screen in the main control room.
  • Two lines inside indicates the device is located in a local panel.
  • Dotted line inside means the device is installed behind or inside of a panel and inaccessible to the operator (normally not in view).

4.Legend Sheets

Also called "Lead Sheets" or “Master Sheets”, this kind of documents are required to explain line identifications and describe all the symbols used on P&IDs. The detail shown on such a legend P&ID will vary with corporate culture, but typically includes these main sections :

  • Line Identification
  • Equipment Identification
  • Instrument Identification
  • Fluid Identification
  • Other Legends
  • Valve Positions
  • Tracing & Insulation Codes
  • Transducer Functions
  • Line symbols
  • Instrumentation symbols
  • Valve symbols
  • Vents & Drains symbols
  • Equipment
  • Piping & Connecting Shapes
  • Tags & Labels

References

1 ASME - B31 Series "For Pressure Piping”
2 ASME - B16.1 "Cast Iron Pipe Flange and Flanged Fittings, Class 25, 1st.Ed.,1989”
3 ISA - S5.1 "Instrumentation Symbols and Identification 1st. Ed., 1984”
4 ISA - S5.2 "Binary Logic Diagrams for Process Operations 2nd. Ed., 1981 (Reaffirmed 1992)”
5 ISA - S5.3 "Graphic Symbols for Distributed Control / Shared Display Instrumentation, Logic and Computer Systems ìEd.,1983”
6 ISA - S5.4 "Instrument Loop Diagrams Ed., 1991”
7 ISA - S5.5 "Graphic Symbols for Process Displays 1st. Ed., 1985”
8 ISA - S18.1 "Annunciator Sequences and Specifications 1st. Ed., 1979 (Reaffirmed 1992)”
9 ISA - S50.1 "Compatibility of Analogue Signals for Electronic Industrial Process Instruments 1st. Ed., 1975 ( Reaffirmed 1995)”
10 ISA - S51.1 "Process Instrumentation Terminology 1st. Ed., 1979 (Reaffirmed 1993)”
11 ISO - 3098 "Drawings-Lettering, Part 1: Currently Used Characters 1st. Ed. 1974”
12 ISO - 3511 "Process Measurement Control Functions and Instrumentation Symbolic Representation
13 ISO - 6708 "Pipe Work components-Definition and Selection of DN(Nominal size) “
14 API - Standard 602 "Compact steel gate valves flanged, threaded, welding and extended body ends 7th Ed., 1998”
15 Graphical Symbols for Process Flow Diagrams, ASA Y32.11 (New York: American Society of Mechanical Engineers, 1961).
16 Austin, D. G. Chemical Engineering Drawing Symbols.
17 Instrument Symbols and Identification Research Triangle Park, NC: Instrument Society of America, Standard ISA-S5-1, 1975.
18 Bausbacher, E. and R. Hunt, Process Plant Layout and Piping Design (Upper Saddle River, NJ: Prentice Hall PTR, 1998).
19 DIN - 19226 - Control Technology
20 DIN - 19227 - Graphical symbols and identifying letters for process control engineering.
21 Hervé Baron (2013) The Oil & Gas Engineering Guide
22 P&IDs Notation, Construction, & Interpretation by Peter Woolf University of Michigan
23 Walker, V., 2009. Designing a Process Flowsheet. Chemical Engineering Progress.

Another calculators or articles that may interest you...

1 P&ID Diagram Basics 1,Purpose, Owner & Contents.
1 P&ID Diagram Basics 2, International Standards.
2 P&ID Diagram Basics 3, Functional Identification and Naming Conventions.
3 Introduction to Hazop Metholodogy, there is all the information about Hazop metholodogy that ever instrumentation technician should know.
4 A complete list of the indispensable books that every professional in process control engineering must have, with prices and direct links to buy them if you want.
5 This table shows us the molecular weigth of common gases and his formula: Molecular Weight of Common Gases
6 Orifice Plate Calculator-Find Orifice Size is an useful tool to calculate the size of an orifice plate.
7 Flow Rate Calculator you can calculate the volumetric flow rate of any liquid or gas through a specific pipe diameter and download results.
8 In the Instrument Simulation Laboratory you have a tool to see the relationship between a tank level measurement located in the field and its visualization in the control room.

Frequently Asked Questions

Q1 What are P&ID symbols, and why are they important?
A1 P&ID symbols, which stand for Piping and Instrumentation Diagram symbols, are graphical representations used in engineering and process industries to depict the process flow, equipment, instrumentation, and control systems of a system or a plant. These symbols are essential for engineers, operators, and maintenance personnel to understand and communicate how a system functions. They provide a standardized visual language for documenting and designing processes, making it easier to troubleshoot issues, plan maintenance, and ensure safe and efficient operation.
Q2 How do I read P&ID symbols?
A2 Reading P&ID symbols can be a bit daunting for beginners, but it becomes easier with practice. Generally, P&ID symbols use standard shapes and lines to represent various components and their interconnections. For example, a circle with a letter inside might represent a pump, while a triangle might signify a vessel or tank. Lines with arrows indicate the direction of flow. The key to understanding P&ID symbols lies in familiarizing yourself with the common symbols and their meanings, which are typically detailed in a legend or key accompanying the diagram. Additionally, you'll need to understand the different types of lines used to represent pipes, instruments, and electrical connections.
Q3 How do I differentiate between a centrifugal pump and a reciprocating pump on a P&ID?
A3 Distinguishing between centrifugal and reciprocating pumps on a P&ID is essential for process understanding. Centrifugal pumps are typically represented with a curved arrow-like symbol, indicating the rotating impeller action. In contrast, reciprocating pumps are represented as a series of straight lines connected to a circle or an oval, signifying the back-and-forth motion of a piston or diaphragm within a cylinder. Additionally, centrifugal pumps often have a single inlet and outlet connection, while reciprocating pumps typically have two, one for suction and one for discharge. Paying attention to these details on a P&ID helps professionals accurately identify the type of pump in use.
Q4 How do I differentiate between various types of valves on a P&ID?
A4 Distinguishing between valve types on a P&ID is crucial for safe and efficient process control. The shape of the valve symbol typically represents the valve type. For instance, a gate valve is represented by a rectangle, while a ball valve is depicted as a circle. To further differentiate valves, you can refer to their labels and accompanying legends, which provide specific information about each valve's characteristics, including size, material, and operational details. In some cases, color-coding or shading may be used to enhance the clarity of valve symbols.